Category Archives: domes

hrmph…

so i’ve been looking at a lot of different sites recently having to do with SEO, and been i’ve been becoming more and more convinced that one of the primary reasons why i’m not bringing in more money from the web site is because it is based on frames. in fact, it has been based on frames for 7 years now, and hasn’t caused me or my visitors any perceivable difficulty so far, but it apparently gets in the way of search-engine crawlers, which negatively affects my google rating and results in my web pages effectively discriminated against when people search for them… which disturbs me, because i’m supposedly in business to make money, and a decision that i made 8 years ago (which was when frames were first being introduced to the web) is now getting in the way of my being able to do business more effectively.

all this has increased the urgency with which i am now modifying my web site, although at this point, the urgency is mitigated by my lack of knowledge of things that i could use to replace the frames. there’s a lot i can do with CSS which affect the way people view my pages, but there’s one thing that – i think – i’m going to have to do with PHP, and i don’t know PHP at all. although people have said to me many times that, if i can understand HTML and CSS, PHP wouldn’t be that difficult, it’s still a daunting task to learn an entirely new language and update my entire web site. the observant person will, of course, have recognised that there’s no time limitation on when i get it completed, but my response to that is to say that every day i don’t update my web site is another day where my google rating is negatively affected by the frames, and another day that people don’t find my web site in search engines, and another day that they don’t purchase things from me. obviously, i could hire some PHP-geek to redesign the entire site for me, but how would i pay for it? and, with what i can afford to pay, what guarantee do i have that my web site won’t suddenly appear as a spammer site and be pushed to an even lower rating in the search engines?

meanwhile, i figured out that i can actually build the structure of the dome that i want to build for a minimum of $200, which is almost do-able – if i want to “make do” with a wooden-frame dome – or a maximum of $400, which is a little bit out of my range at the moment, but shouldn’t be too hard to achieve within 6 months if i work at it – for a metal-frame dome. i built a model out of toothpicks and kneaded-rubber eraser, to see exactly how many frame-pieces i am going to need: 35 sections that are 4 feet 11.28 inches (8 foot radius time a chord factor of .61803), and 30 sections that are 4 feet 4.44 inches (8 foot radius times a chord factor of .54653) to build a 16-foot diameter 2V Icosa Alternate dome.

the only problem is that i keep getting catalogues from places that have stuff i really want to buy (and sell), and the result is that instead of having $180 in my bank account, i spent $75 on some ganesha murtis which should be delivered some time early next week.

but at the same time, i also got a business card order from NBAC, which should replace that $75, and it may even do so before the ganesha murtis are delivered.

a sigh of relief… and then back to work

080924 new computer/keyboard workstation

things are starting to get back to normal after the battle of the computer. although i really hate having to re-create things like my calendar, which has already screwed me up and forced me to contact a person to say that i wouldn’t actually be performing at his event because i had already made arrangements to be a performer at another (paying) event. i also really hate that i have to re-create about 100 hours of database entry, which was just beginning to take shape when the computer died last month.

on the other hand, once i get the chaos sorted out, i will actually have a fair amount more room in my “workshop” that isn’t being taken up by computer/keyboard stuff, and now that my computer and keyboard stuff aren’t in the same room, i can do more stuff that involves my band saw and drill press – the former of which is visible in the lower right hand corner of the photo, having not been moved to its final location due to the aforementioned chaos – because of the dust which i didn’t want to infect my computers and keyboards… which means that, potentially, i may get my pipe-making back on track again, and i’ll certainly have more room for musical instrument repair as well.

of course that doesn’t mean that the idea of putting my workshop in a dome is dead. i have already planned the dome and done some work on pricing out the constituent components, and some figuring out of where i can get some more esoteric building materials such as star plates. i want to build a 16-foot diameter 2V Icosa Alternate dome, because it has more space at the level of a workbench than a standard icosahedron. i believe that star plates would still work, except for where the equilateral triangles come together. i still have to work out how to connect 6 points, which means i still have to figure out whether to use lumber or metal for the edges. if i use metal, i can just flatten the end of the tubes and bolt them together, which is an effect i saw used at burning man, but if i use (cheaper) lumber i may have to figure out where to get – or figure out how to create – star plates that have six slots, rather than five. i talked with the people at stromberg’s chickens, and they said that they were marketing a device that was left to them by the original engineer when he died, and they don’t want to mess with the design out of respect to him, but it shouldn’t be too difficult to figure out what they should look like, the hard part is getting them manufactured.