snurl

it’s raining, which means that instead of cutting out the part of the floor near the back door that has a hole in it, next to the back door, i’m doing this instead. i’ve been able to get some work done in the morning, but since i went to buy the replacement flooring and came home – around noon or so – it has been raining hard enough that i can’t do the important part, which is cutting out a piece of floor 4′ x 1½’, and cutting a 4′ x 1½’ piece of replacement flooring. i’m still not 100% sure of what i’ll find once i cut the hole in the floor, in spite of the fact that i’ve actually climed underneath the house. i do know that there are two joists directly below the middle of the door, but there is a cloth vapour barrier of some kind underneath the house. it’s ripped away right underneath the door, which is probably one of the reasons why the hole is right next to the door, but it is in place once the door frame ends, and the piece of flooring i have to replace goes all the way to the end of the hall. fortunately (i guess), the wood that i have to replace is very likely 30 year old rotten press-board, so instead of cutting away most of it, i can probably just break out most of it manually, so that i can see what’s down there before i cut the replacement piece.

tomorrow i’ve got a gig at the ballard locks with the ballard sedentary sousa band, so i probably won’t get the chance to work on the floor until later on tomorrow afternoon, at the earliest.