what i’m doing

Moisture Festival 2013 – this week i’m performing with the fremont philharmonic. next week i’m performing with snake suspenderz.

and, in the middle of all this, we’re having our house completely re-piped to alleviate the massive problems we’ve been having with the plumbing, AND we’re having the kitchen and pantry floor torn out, down to the joists, and replaced, and then we’re having new linoleum laid down in the kitchen, pantry, and my office… which means i have to completely disconnect and move everything, and then reconnect it all once i’ve moved it back.

according to moe, the contractor is coming in to rip out the floor on monday, and he says it should take two to three days to replace it… however, if the joists are still wet, then it’ll probably be longer, because at that point we’ve got to have servicebastards and their portable noise generators (otherwise known as “fans”) come back out and try again…

fortunately, i’m going to be away from the house for most of this… 😛