🤬

i’m so used to being depressed and anxious that, when things are going well, instead of enjoying the fact that things are going well, it makes me more depressed and anxious, because i KNOW that things are getting ready to go “wrong-er” than they have ever gone before, and they’re just waiting for me to relax and ease my guard a little, so that they will have even more effect… 🤬

one week of moisture festival down, one fluffing session complete (also, a term used in vaudeville, to describe preparing the awaiting audience outside the theatre for the show they are about to attend: getting them “in the mood”… 😉), and one more week to go… it’s kinda sad that this is probably going to be the last show in the palladium (and, possibly, the last moisture festival, ever), but it’s good that we were the band that had two weeks this year. i realise that i have been complaining, almost every previous year, that other bands were getting more of the limelight, but it’s good that it worked out this way, and i can say that i’ve been a part of the moisture festival ever since the beginning, when we did the show in rev. chumleigh’s tent in downtown fremont…

i’m getting totally fed up with the former owner of our house: ron zeising, general contractor and owner of a “home improvement” business, who thought that, because he was a general contractor, he could make “improvements” on his (now our) house “on the cheap” and skirting (or outright ignoring) building codes. recently (last month?) we paid $6,000 to a HVAC specialist to rip out and replace ALL of the heating ductwork in the house, because poor design (by ron zeising) meant that most of the heat from the very expensive, top of the line furnace (which was one of the selling points of the house), was going into the crawlspace, and the heating bills were through the roof.

of course, ron never had a problem with the heating bills, because, despite the fact that he had an expensive, top of the line furnace AND a heat pump, which provides central air conditioning as well, ron heated the house with the wood stove, and left all the doors and windows open in the summer… 🤷

we just had the last workman leave from rebuilding the “retaining wall” under our deck… and it’s a good thing, too, because, if we hadn’t, the deck would have eventually fallen off. now it is a good deal less likely to fall off, but in order to make it secure, it still needs some work: when it was in the process of being built, ron zeising just piled large rocks, bricks (including half of someone’s chimney, and a large cylindrical concrete footer for a post), and random construction rubble, next to the house, covered it with a thin layer of topsoil, and then built a deck over it… concrete pillars, on top of a thin layer of topsoil, and construction rubble… 🙄 it’s as though he thought that, because of the fact that he was a general contractor, nobody would ever question the work that he did, so he just. didn’t. care. 🤬

however, end result: we got a nice, new, secure, sturdy retaining wall, a couple of new raised beds to grow vegetables, and A LOT of new concrete under the deck pillars(!)… 👍 and yet another $6,000 chunk taken out of our checking account. 🙄